Open Other Construction DC

Reconstruction of Anacostia Ave Bridge 78

Washington DC (PASS)

10 Days Left Due Mar 27, 2026

Description

Work under this contract consists of the reconstruction of the Anacostia Avenue Bridge over Anacostia River Outlet (Bridge 78) project in Washington DC (Project). The Contractor shall provide all labor, materials, equipment, tools and incidentals necessary for the construction of the Project in accordance with the Contract Documents (the Work), which includes providing all materials, equipment, labor, tools, and incidentals necessary to complete the work as shown on the contract plans, standard specifications and the supplementary specifications (also referred to as special provision). The specifications and special provisions describe the minimum requirements for the material, quality control, and construction that shall govern the Work to be performed.

Details

Solicitation #
DCKA2026B0027
Type
Other
Status
Open
Posted
Jan 6, 2026
Due Date
Mar 27, 2026
Category
Bridge Reconstruction
Industry
Construction

Location

City
Washington
State
District of Columbia

Organization

Name
Washington DC (PASS)
Type
state
Website
https://maps2.dcgis.dc.gov/dcgis/rest/services/DCGIS_DATA/Government_Operations/MapServer/19