Open Other Transportation INTL

Manchester International Airport Phase 2 - Platform Civils

UK Government - Contracts Finder

What is bid ocds-b5fd17-7a56a3ef-837e-44f8-8e43-40be3e4ea4b9? UK Government - Contracts Finder is soliciting OTHER for transportation in INTL. Responses due Dec 4, 2026 (11 days from now). Estimated value $1.0M – $2.5M.

Free account · no credit card · comes back to your list
11 Days Left Due Dec 4, 2026
Value$1.0M – $2.5M
LocationClippers Quay, INTL
PostedNov 23, 2026
View Original Posting UK Contracts Finder
🔓 Direct access Opens on UK Contracts Finder. Notice details are public.

Description

Seeks bids for expanding airport platforms to accommodate longer train services. Civil engineering firms specializing in railway infrastructure would bid.

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The works comprise the construction and completion of the platform civils work at Manchester Airport Station. • Platform demolition • Asset recoveries • Track walkway/crossings • UTX • Troughing • Riser wall foundations • New riser walls (blockwork and PCC) • Copers (including realignment) • Tactile paving • Drainage (ACO's and carrier) • Ducting • Equipment foundations (in-situ and PCC) • Waiting shelter foundations • Platform furniture • SME works (end of platform ramps) • Fencing/Gate works • Block paving/surfacing • Associated reinstatement works

Similar open bids in INTL

See all transportation bids in INTL →

We don't have this bid's documents on file yet — get them from the source portal.

When we do have an agency's documents on file (about 1 in 10 open bids), Pro members download them directly on ProcureTap — no vendor registration on the source system, one click. Plus unlimited saved searches and daily email alerts.

Try Pro free for 14 days →

Details

Solicitation #
ocds-b5fd17-7a56a3ef-837e-44f8-8e43-40be3e4ea4b9
Type
Other
Status
Open
Posted
Nov 23, 2026
Due Date
Dec 4, 2026
Estimated Value
$1,000,000 – $2,500,000
Category
airport platform expansion
Industry
Transportation

Location

City
Clippers Quay
State
INTL

Contact

Name
Mark Thompson
Email
[email protected]
Phone
07895307597

Organization

Name
UK Government - Contracts Finder
Type
other
Website
https://www.contractsfinder.service.gov.uk

About UK Government - Contracts Finder

UK Government - Contracts Finder is a other based in INTL. They currently have 122 open procurement opportunities on ProcureTap.